The article introduces the construction technology of center drift method for shallow excavation tunnel in Beijing Metro Line 5, analyses the monitored data for the earths surface.
介绍了北京地铁5号线磁器口车站浅埋暗挖隧道中洞法施工技术,对地表监测数据进行了分析。
2
This paper also presents a method to solve the tunnel axis displacement on line caused by angle error between tube center axis and datum of joint.
分析了对接面与管段中心线夹角误差对沉放后线路位置的影响,提出了控制隧道轴线偏差的措施;
3
The processing method on rock wall between foundation pit of Chongqing World Trade Center and the branch opening of main line of Linti tunnel is introduced.