The team then failed to run a test to establish that the cementseal was adequate.
而且,油井队没有进行实验来证明水泥封堵是合适得。
2
The report indicates that a bad cementseal on the oil well allowed gas and other liquids to flow up the production pipe.
这份报告表示,油井上一个有问题的水泥塞使得天然气和其他液体通过生产管道涌向海面。
3
Engineers had spent days pumping heavy drilling fluid into the leaking well head on the ocean floor in a high-pressure bid to smother the gushing crude and ultimately seal the well with cement.