For structures in construction chute or footpath provided with enclosure intermediate rail and foot plates must be erected.
对于在施工中的结构,需搭设带围栏、中档、脚踏板的斜道或走道。
2
The novel configuration proposal reduces and even eliminates the phenomena of fed material skip, chute scarring, discharge trolley rail corrosion, difficult discharge and so on.