Truck is able to access into the coal yard at both ends. the EOT crane shall over pass the road for coal incoming.
卡车能访问入煤炭围场在EOT起重机将通行证路为煤炭接踵而来的两个结束。
2
A (temporary) running girder crane, with a reach covering the above points and extending to a location convenient for further transport of the coal burner, would be recommended.
It has been widely applied to the field of construction machinery, such as concrete machinery, truck crane, port machinery, road machinery, piling machinery, crawler crane and coal machinery.