In Jiangsu Shahe Pumped-storage Power Plant, both main dam and auxiliarydam of upper reservoir are rockfill dam with concrete slab.
江苏沙河抽水蓄能电站上水库主、副坝为混凝土面板堆石坝。
2
The monitoring results of Guanjiachong auxiliarydam are analyzed; and we think that it should be safety monitoring with intersubjective project in-phase for long.
介绍了两种情况下,官家冲副坝的监测成果及分析,认为该坝应该与主体工程同步进行监测。
3
Sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at Chalong Hydropower Station.