The installation and construction of BAS is a construction project with advanced technology, wide realm and large investment, its construction quality relates directly to the normal operation of BAS.
Firstly, the design requirements, the design principles and the design process of the BAS were introduced and several reasons for the low use efficiency of the current BAS were analyzed.