Within the protection zone for a water project, any act of blasting, sinking a well, quarrying rock, and collecting earth, which endangers the safety of the water project, shall be prohibited.
在水工程保护范围内,禁止进行爆破、打井、采石、取土等危害水工程安全的活动。
2
For the industrial pollution sources locating in the zone of municipal wastewater collecting system, effects of instant or accidental discharge of chemical compounds must be assessed.
The pressures in the relaxation zone behind a shock front for gas-particle flow were measured in the vertical shock tube with a system of injecting and collecting particles.