The flexure portion 18 projects beyond a distal apex of the load beam spring element portion 12.
弯曲部分的18个项目超出负载的梁弹簧元的部分12个远端的顶峰。
2
The flexure portion 18 includes a first connection arm member connected at a proximal end thereof to the distal apex of the load beam spring element portion 12.
弯曲部分的18包括第一个连接臂成员在近端延展至负载梁弹簧元的部分12个远端连接的顶点。
3
The dead load shear and impact shear testing were performed from both of root apex direction and cutting edge direction.