As Daya Bay nuclear power station has entered the 18-month fuel cycle, the bias of calibration curve from 1d code is growing larger.
大亚湾核电站两台机组在进入18个月换料之后,原来用一维程序计算的刻度曲线出现了越来越大的偏差。
2
Through the analysis series, found the curve for former fourth-order magnetic resonance frequency of single degree of freedom magnetic bearing system changes with the axial gap and bias current;
通过一系列的分析,找到了单自由度磁轴承系统前四阶共振频率随轴向磁隙和偏置电流的变化规律曲线;
3
This paper gives a new kernel estimate, bandwidth parameter and the bias-corrected confidence belt for nonparametric regression curve.