The TGPs third stage river closure is a key works for the early stage cofferdam supported power generation and guarantee of the successive construction of hydroelectric plant and dam at right bank.
三峡工程第三期截流工程是确保实现初期围堰挡水发电及同时修建右岸大坝和电厂的关键性工程。
2
High water levels forced the closure of the ship locks at the dam on Monday.
由于水位高涨,星期一所有船闸被迫关闭。
3
This paper investigates the favourable impact of the central dumping during high arch dam abutment excavation on river closure.