Predicting and controlling the hook load and casing running depth in the process of completing extended reach Wells is one of the key factors to ensure the completion to be successful.
大位移井在套管下入过程中大钩载荷和套管可下入深度的预测是大位移井成功完井的关键因素之一。
2
In horizontal well, frontal side casing string is usual bearing pressure. In horizontal hole section, with the length of casing increase, the hook load is decreasing on the contrary.
水平井的前端套管一般是承受压应力的,随着进入水平段的套管长度的增加,大钩载荷反而下降;
3
The air conditioner installing structure includes casing with slots for hook in the back side;