Atmospheric pressure then pushes the piston back down the cylinder, and if anything (such as a pump) is attached to the piston, some useful work can be done.
On May 26th BP started to pump heavy drilling mud into the blowout preventer, the set of valves at the top of the well to which that broken pipe is attached.