Also referred to as the actual costofworkperformed.
有时也称已完工作的实际成本。
2
Let's say the project was estimated based on the labor of senior engineers (i.e., expensive), but the work is actually being performed by more junior-level engineers (i.e., at a lower cost).
The actual unit cost for any item at any time is obtained by dividing the accumulated costs charged to that item by the accumulated units ofworkperformed.