There is no estimate yet of the total costof the project or the volume of water involved.
目前还没有预测海水淡化项目的总费用或具体需用多少立方的海水。
2
This paper studied on the system analysis, design and application ofwater and electricity project bid management information system based on cost analysis.
本文就基于造价分析的水利水电工程招标管理信息系统的系统分析、设计与应用问题进行了研究。
3
In fact, besides resource price, project price, environment price, profit and revenue, the costof institutional design and innovation is also a part of the full-cost water pricing model.