Three control measures of subway tunneling adjacent Piles are put forward:subway construction measures, soil reinforcement measures and bridgeframework measures.
提出了地铁隧道邻近桥桩施工的三个方面的主要控制措施:地铁施工措施、土体加固措施、桥梁结构措施。
2
The framework described here provides a bridge between programming models and operational run-times to allow the gaming industry to reap the benefits of becoming an on demand e-business.
Instead, an interface defines the semantics for both your domain class and the ScheduleItemForm class, which ACTS as a bridge between your domain and the framework.