Through technical analysisand calculation, the critical coefficient and optimal load rate of transformer are determined for the reasonable selection of transformer capacity.
通过技术分析和计算,确定变压器临界系数以及变压器的最佳负载率,合理选择变压器的容量。
2
Based on the comparing andanalysis, it points out the reason of lower loadcapacity of dive drilling hole pile.
在比较分析的基础上,指明导致潜水钻成孔灌注桩承载力较低的原因。
3
For the checking of bridge carrying capacity, normally we use analysis account method, load test method and object research comparative method.