The G-222 aircraft, which were built between 1977 and 1985, are receiving avionics upgrades, while two will also be given sound-proof, VIP transport modules.
There is also scepticism about whether the original goal, a surface large enough to create a floating runway that could accommodate transportaircraft, is either financially or physically feasible.