Mountain tunnel construction with high water pressure will apply the tunnelboringmachinemethod (TBM) more and more.
长大深埋高水压山岭隧道的施工将越来越多地采用隧道掘进机法。
2
To improve the capacity and efficiency of the design system of backup transportation scheme for tunnelboringmachine (TBM), a new hybrid-solving method was proposed.
为提高隧道掘进机后配套运输方案设计系统的能力和效率,提出了一种工程装备方案设计的混合求解方法。
3
In order to rationalize type selection of the full face rock tunnelboringmachine, a comprehensive solution substituting the empirical choosing method is presented.