Unloading system adopts hydraulic station centralized control, the rapid and reliable.
卸料系统采用液压站集中控制,迅速可靠。
2
A strain energy method for unloading zonation is presented, and the application of Xiaowan Hydropower Station has confirmed its feasibility and efficiency.
给出了岩体卸荷分带的应变能方法,小湾水电站的实际应用表明该方法是可行的、有效的。
3
Now lets suppose that both trains are at the railroad station loading and unloading passengers and baggage.