It briefly introduces the integral hoisting method of gate mechanism, stressing check and hoisting turnover process during the erection of bulb tubular turbines.
简要介绍灯泡贯流机组在安装过程中,导水机构整体吊装方法、受力校核及吊装翻身过程。
2
Majitang Hydropower Station is the first tubular hydropower station in China, there are no emergency gate set ting in23spillway gates, so those working radial gates can not be tested and repaired.
The results show that, in the tubular pump start the process, the delay time of opening gate and the speed of the starting gate are significant influence the transition process.