Inofficecalculation of closed traverse, the Angle of connection is not corrected, because there is no check condition.
在闭合导线内业计算中,由于连接角没有检核条件,因而对连接角未进行改正。
2
The article studies the sub-hydraulic lifting scaffold in high-rise building design, calculation and application, and to pay for a flight in the Office building Project as an example to elaborate.
Strata thickness calculation is a routine work inoffice operation and geological analysis after field operations, while the traditional calculation may spend geologists a lot of time and strength.