Secondly, this paper analyzed the existing problems in Wuan irrigated district currently and accounted the water cost price of watersupply engineer in the Tenth Branch Canal.
分析五岸灌区十支渠现行水价存在的问题,以十支渠水利供水工程为例测算成本水价。
2
The supply of irrigation water to the downstream from the Huangfeng canal was cut off during construction of the right bank dam of Suzhi hydropower project.