The formula is therefore considered as available to the calculation of drawing force on tubesinking.
该计算式可用于圆管空拉拔制力计算。
2
Finally, a simulation test to verify that the model can be suitable for measurement required in the process of tubesinking.
最后通过模拟试验进行验证,得出了该模型能够满足管段沉放测量要求的结论。
3
In the complex soft layer contained large quantity of living rubbish, construction on sinking tubular pile with conventional method, will lead on to reduce tube diameter.