The thermal system of HRSGs is introduced for a 700MW-class combined gas-steam cycle unit with multi-shaft arrangement in present paper.
介绍了一套700MW级多轴布置的燃气-蒸汽联合循环机组及其余热锅炉的热力系统。
2
By a mounting example, the problems existed in unit mounting and shaftsystem alignment of coupling are analyzed and discussed.
通过一个安装实例,分析探讨了联轴器在机组安装时的轴系对中问题。
3
It is a critical task need to be solved urgently that the skip loading system for vertical shaft without measuring pocket should be equipped with quantitative loading unit.