A foundation with sufficient stiffness to resist long-term wind and wave load to insure the serviceability of windenergyconverter is needed.
一个足以承受长期波浪及风力的基础设施是让风力发电设施在使用年限内正常运转的必要条件。
2
By adding damp load at DC-side of the converter, redundant energy at DC-side during grid faults will be consumed, therefore the operating of wind turbine will not be influenced by grid voltage sags.