The Design Institute of the Changjiang WaterResourcesCommission conducted a monographic study on concrete placement in restrained zones of the dam foundation in the hot season of the year 1999.
长江委设计院对1999年高温季节浇筑大坝基础约束区混凝土进行了专题研究。
2
Wang Jingquan, a drought and flood prevention official at the Changjiang waterResourcesCommission, said the Three Gorges Dam was designed to withstand up to 110,000 cubic meters of water a second.