After water dynamics analysing and calculating, an old waterreservior is rebuilt into a precipitating equipment combining with the terrain and the present condition of water project.
根据地形和水利工程现状,通过水动力学的分析和计算,将旧水库改建为给水系统的混凝沉淀设施。
2
Jiudianxia Reservior is a multipurpose water conservancy complex constructed on Taohe river.
洮河九甸峡水库是一座综合利用水利枢纽。
3
The two vertical-flow land system was adopted to treat miro-polluted water of the Chanzhi Reservior in Qingdao.