The application of the middle linemethod of dam construction and the tailing transportation using water isolation pumps are an effective way.
采用大坝中线法施工,采用隔水泵输送尾矿是一种行之有效的方法。
2
It explained the essential steps of the early warning system, and introduced the application of the method, with the example of South-to-North Water Diversion East Line Project.
对预警系统运作的基本环节作了具体说明,并以南水北调东线工程为例,介绍了该方法的应用成果。
3
The time history of water hammer in pipeline in the condition of unit emergency load dump is calculated by characteristic linemethod.