Through deep hole blasting, waterinjection and roof strata of integrated management measures for the effective solution of the gas problem.
通过采取深孔爆破、顶板注水和矿压分析等综合治理措施,有效的解决了瓦斯问题。
2
The anchoring or set to the artificial bottom hole of the separate injection pipe string has solved the creep of the pipe string resulted from the unstable water injection pressure.
分注管柱实施锚定或支撑到人工井底,克服了管柱因注水压力不平稳等原因造成的管柱蠕动现象;
3
The effect of stress-releasing hole and waterinjection to the face on rock stress state around gateway driving face has been studied in this paper.