Model foundation is built in model shafts of laboratory test tank and WJP is drived in different soil horizons temperature.
在室内试验模型槽内构筑模型地基,在不同的土层温度下打设湿喷桩。
2
Removal and volatility of lead in WJP coal and HYS coal during sub-critical water treatment in a semi-continuous reactor were studied.
运用半连续反应装置对山西吴家坪煤和四川华荧山煤中铅在亚临界水萃取过程中的脱除率和挥发性进行了研究。
3
Via the indoors model tests simulating the realistic projects, the cores of the tests are exact emersion of the process of making piles and the environments of the WJP composite foundation.