As a compromise, how about putting two hard tracks at the front of the house, leaving the rest of the area to absorb water and provide for the plants and birds?
折衷一下,在房前修两条停车道怎么样?别的区域可以留着吸收水分、供养花鸟。
2
In tunnel construction of rich water karst area, the key technology to guarantee the tunnel construction security is to detect and forecast the geological situation in front of the tunnel face.
For example, if you have a shallow waterarea that holds bass, and it is close to deeper water and a weather front (whether it be a cold or warm front) moves in, it will effect the shallow water.