On the basis of synthetic analysis of hydrogeological informations and in situ investigation, an overall programme of blockingwater suitable for Dahe Gold Mine is worked out and designed.
The treatment methods, technology, quality control measures and treatment results for the blockingwater with grouting treatment project in a bursting water coal mine of Henan province are introduced.