The two-unit cold standbysystem and the two-unit warmstandbysystem are discussed.
本文讨论两元件冷储备系统和热储备系统。
2
The classic example is a disaster recovery test, which involves failing over to a warmstandbysystem, testing the applications, and then failing back to the primary systems.