The type-conversion cost of the resource-type cities can be divided into the adjustmentcost and the delay cost.
资源型城市转型成本可以分为调整成本和延误成本。
2
The power generation strategies with minimized adjustmentcost of the generating sets and its mathematical model are proposed.
文中提出了机组调节成本最小化的发电策略及其数学模型。
3
The adjustmentcost minus the delay cost is the net cost of the type-conversion, and the adjustmentcost plus the delay cost is the total cost of the type-conversion.