Results:The distal transverse palmar arches(DIPA) were 73%, 19% and 8% in nail root crosssection, distal and proximal nail root respectively.
结果:指动脉的远侧掌横弓位于甲根平面、甲根平面以远和以近者分别占73%、19%和8%。
2
Stress distribution at crosssection of transverse uniformly distributed load and non-uniformly distributed load applied to concrete cylinder by finite element method is analyzed.
采用有限元的方法计算分析了混凝土圆柱体在受横向均匀线荷载和非均匀线荷载时其横截面上的应力状况。
3
The longitudinal cracks along bond line and the transverse cracks which cut across the weld metal crosssection inside weld metal were formed, while X65 pipe line steel was welding.