The work organizing process integrated with risk analysis of Guangdong Daya Bay Nuclear Power Station (GNPS) is depicted.
描述了贯穿于广东大亚湾核电站日常工作组织过程始终的风险分析的概念和方法。
2
Previous work on this problem has typically assumed that the channel conditions between the base station and the users are governed by a stationary stochastic process.
在此问题上,以前的研究工作中一个经典的假设是基站与用户之间的信道条件变化为一平稳随机过程。
3
The structure control systems includes the dividing plate which have four workstation, pneumatic system, machining working process.