Assembly and transport of components to GEWE or the construction site may only take place after the coating system has hardened.
部件组装及运输至GEWE或建筑现场的工作仅能在涂层系统完全硬化后才能进行。
2
Thee aim of measures taken must be to eliminate any risk throughout the foreseeable lifetime of the machinery including the phases of transport, assembly, dismantling, disabling and scrapping.