The weight of steel for crane beam has a great proportion in the total amount consumed in the construction of the heavy-duty plant with large-tonnage cranes.
In case that the weight and volume of shipment exceed the tonnage control, Party a has no responsibility for the delay arising from it.
货物体积、重量超出吨控预定,导致发运延误,甲方不承担责任。
3
The problem that needs to be solved is to provide a small tonnage forklift controllable fork having simple structure, light weight and automatic lubrication function.