They were constrained to the cable rig in a hanging position and were animated to the correct speed to land on the train.
他们被迫有线模拟试验台是一个悬挂的位置和速度动画片正确地在火车上了。
2
In the paper, a method for spatial vibration analysis of the system of train and long span steel trussed cable-stayed bridge is presented.
本文提出了一种分析列车、大跨度钢桁梁斜拉桥系统空间振动的方法。
3
Signal cable plays an important role in signal safety control equipment, once there is cable fault occurred, it will interfere severely the train operation;