So I will now make an attempt to load down the copper wire.
现在我要努力,装进铜线。
2
And to check before and after the two wire plate load, the center of the wire slot is not high.
并且要检查前后两支导线板装入后,其线槽中心是不是等高。
3
In a leader, installed in the upper crossbeam gabion stone kg, plus kg load under the action of external load, while the central beam bending deformation, but the wire cage has not broken beam.