Engineering change management. To register EC No. , trackstatus and record the document.
负责工程变更编号的发放与管理,工程变更的状态跟踪及文件存档;
2
Keeping specific goals and metrics for testing in mind not only helps trackstatus and results, but also avoids the last-second scramble to pull together necessary reports.
牢记测试的特定目标和测试方法不仅有助于跟踪状态和结果,还能避免最终将所需报告混在一起。
3
This allows the repository and the model managers to track the status of every copy of the models.