A second element of this form of seabasing is the "mobile landing platform" (MLP), a ship longer than two football pitches, with a large, flat platform.
In this paper, stress analysis has been made on a barge-carrier by the finite element method, For this new ship design, two plans of structural arrangement have been proved.