The field disturbance during construction, such as the installing of verticaldrain, was distinct from the sample disturbance.
这种施工过程中土体受到的原位施工扰动有别于现场取土、应力释放等引起的试样扰动;
2
According to geologic characteristics, the vacuum preloading with prefabricated verticaldrain (PVD) method was adopted to treat the soft soil in the intertidal zone.
针对潮间带的地质特点,采取真空预压法联合塑料排水板加固处理潮间带软土地基。
3
Based on the above, the relationship between the disturbance area and the plastic area during the verticaldrain construction is discussed, combined with project cases.