By mid-2006, construction of the main wall was completed and a reservoir more than 2 miles (3 kilometers) across had filled just upstream of the dam.
到2006年中期,建设主墙已完成,水库超过2英里(3公里),跨越了充满正义上游的大坝。
2
The technique of extruded concrete side wall is a new method for construction of upstream face slab of CFRD, which was first used during construction of the Ita dam in Brazil.
挤压式混凝土边墙技术是混凝土面板堆石坝上游坡面施工的新方法。
3
On this basis, the curve shapes and the formulas of upstream crest and downstream crest and those under the breast wall of the spillway dam are presented.