And the Three Gorges reservoir area of the transmission line, from Wanzhou Three Gorges migrants Square, the plaza to the end of Xinlian Xin, a totallength of 42 km.
而三峡库区的传递路线,是从万州三峡移民广场开始,到心连心广场结束,全长42公里。
2
According to "the mid-long term planning for China's railway network", there will be a passenger dedicated line network with totallength of 16000 kilometers by 2020.