The each time parameter of construction schedule network planning in the graph may be exposed immediately, the totalfloat and the free float of each work especially.
图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。
3
The totalfloat time is one of the important time parameters for a working task, and also is the basis for ascertaining critical work and critical paths in network planning.