We often use the domain controller as the time server and run the Windows Schedule task on the involved Lotus Connections server hosts to do time synchronization with the domain controller.
The production schedule system in cell controller for FMC proposed by authors consists of decision-making plan of front-end processing, dynamic real-time dispatching and the controls.