The improved PSO algorithm is tested in two models, to show the effects of improvement and its ability in solving the inverse timeovercurrentrelay coordination problem when DG units are connected.
For backup protection against high resistive ground faults, there will be a dual polarized directional overcurrentrelay, inverse time with instantaneous trip attachment.