Can only be disconnected in the normal run-timeload current switching.
仅能在正常运行时断开负荷电流的开关。
2
A specific method of real timeload optimized distribution in power plant is presented upon SIS platform.
提出了在SIS平台上开发火力发电厂实时负荷优化分配系统的具体方案。
3
The principle of extension short-timeload forecast was put forward, that is forecasting unknown load point by adding information of new load point to the point, the load was known.