This paper analyzes the balance between Iron-making and Steel-makingprocess, and puts-forward the measures to improve it. The effect of the improvement is analyzed.
本文针对铁钢工序平衡存在问题进行了分析,提出了具体的改进措施,对实施效果进行了总结。
2
The cooling flue pipes of vaporization system is one of the main equipment in steel-makingprocess, whose working environment is extremely bad, taking place water leaking phenomenon easiest.
转炉汽化冷却烟道是炼钢过程中的主要设备,其工作环境极其恶劣,极易发生漏水现象。
3
It is phosphorus that limited the converter slag's recycling in steelmakingprocess.